1- Installation

RGT® oil and grease traps are easy to install

It is equipped with holes for connection on the entry and exit lines starting with 11/2 inch and side holes equipped for installing valves to discharge oils, grease and washing.

 

Installation stages:

1- Before starting the installation, we must pay attention to the necessity of placing the trap completely flat, and this is done by controlling the four ground rules of the trap, which are rotatable so that the horizontal leveling of the trap is calibrated.

2- The entry and exit line shall be connected by means of a plastic serrated (bushing) adapter, according to the existing size, taking into consideration that the exit line does not rise above the level of the exit hole.

3- Oil and grease lockers are installed and preferably directed downwards.

4- The stopcock is completely horizontal installed.